MVP Development Cost: Price Bands, Timelines and What Drives the Price
By Obaid Tariq, Founder & Lead Engineer · Published
Obaid founded AI Dev Planner in 2022 and leads engineering on its client projects from Islamabad, Pakistan.
Disclosure: AI Dev Planner builds MVPs for a fee, so we have a commercial interest in this topic. Every price on this page is our own published band, not a market survey; other agencies and freelancers price differently. See our disclosure policy.
This is the educational guide to MVP pricing: it explains what drives the price, so you can judge a quote before you buy a build.
Most MVP cost articles give a range so wide it cannot help you plan. This guide uses the bands we actually quote from, says which inputs move a project up or down inside them, and lists the costs founders forget: the step before the build and the running costs after it.
For a number based on your own scope, use the MVP cost calculator. It uses the same bands as this page.
How much does MVP development cost?
A focused SaaS MVP from AI Dev Planner costs $25,000–$65,000 (USD) and takes 8–12 weeks after the scope is written. In our UK bands, a robust MVP is £25,000–£45,000. Internal tools start at about £40,000 and customer portals at about £60,000, because they carry more roles, integrations and security work.
| Product type | Published price band | Typical timeline |
|---|---|---|
| Focused SaaS MVP | $25,000–$65,000 (USD) | 8–12 weeks |
| Robust MVP (UK bands) | £25,000–£45,000 (GBP) | Scoped on your brief |
| Web application MVP | £25,000–£45,000 (GBP) | 12–16 weeks |
| Internal tool | £40,000 to well over £80,000 (GBP) | 12–20 weeks |
| Customer portal | £60,000 to over £120,000 (GBP) | 16–24 weeks |
These are fixed-milestone quote bands, not hourly estimates. The final figure is agreed from a written scope; see our pricing for the full terms. If any page on this site disagrees with /pricing, /pricing wins.
What makes an MVP cost more or less?
Six inputs move a quote inside its band: how many user roles there are, how many outside systems it connects to, whether AI is a helper or the core of the product, how much reporting the admin side needs, whether you need a native mobile app, and how strict your compliance needs are. Having designs ready lowers the cost; starting with no design work raises it.
| Driver | Keeps cost lower | Pushes cost higher |
|---|---|---|
| User roles | One role | Four or more roles with different permissions |
| Integrations | None | Three or more outside systems |
| AI features | None | AI is the core of the product |
| Admin and reporting | Basic admin | Advanced reporting and dashboards |
| Mobile | Web only | A native iOS and Android app |
| Compliance | Standard | Regulated data, such as health or finance |
| Design | Designs ready | No design work done yet |
Does an AI MVP cost more than a regular MVP?
We quote AI MVPs against the same focused-MVP band of $25,000–$65,000. AI as the core of the product moves a quote toward the top of the band, because it adds evaluation work, retrieval over your data and cost controls. Model and hosting bills are paid by you, directly to the providers, on top of the build.
The extra work in an AI MVP is not the model call itself. It is the evaluation set that tells you whether the AI is good enough to launch, the access rules that keep one customer's documents away from another, and the usage limits that keep token spend predictable. See AI MVP development for what that build includes.
What costs come before and after the MVP build?
Before the build, a two-week Validation Sprint costs $2,500–$5,000 and is fully credited to the build if you go ahead. After launch, there is a defect warranty, then maintenance at roughly 15–25% of the build cost per year, plus hosting and third-party services paid to their providers.
- Validation Sprint, before the build: $2,500–$5,000 over two weeks, ending in a written scope and a KEEP, PIVOT, RESEARCH FURTHER or STOP verdict. See how the Validation Sprint works.
- Warranty, after launch: reproducible functional defects are fixed during the warranty period agreed in the contract.
- Maintenance, after the warranty: roughly 15–25% of the initial build per year, excluding hosting and licences. See the website maintenance cost guide.
- Hosting and services: cloud hosting, email, payments and AI model usage are billed to your own accounts.
How do I estimate the cost of my own MVP?
Answer eight questions in the MVP cost calculator to get an indicative range and timeline inside our published bands. Then write down the one workflow your MVP must prove, the user roles and the integrations, and ask for a fixed-milestone quote against that scope.
- Run the MVP cost calculator for an indicative range.
- Write the one workflow the MVP must prove, and list what you will leave out.
- Check the timeline in how long it takes to build an MVP.
- Ask for a fixed-milestone quote from a written scope, not an hourly estimate.
If you are not sure an MVP is the right first step, compare it with a prototype or proof of concept in MVP vs prototype vs proof of concept.
Frequently asked questions
What is the cheapest way to build an MVP?
Is a fixed price better than hourly for an MVP?
Do I own the code after paying for an MVP?
Can I build an MVP for under $10,000?
Sources
- AI Dev Planner: Pricing (published price bands) — Focused SaaS MVP $25,000–$65,000 over 8–12 weeks, Validation Sprint $2,500–$5,000, and maintenance at 15–25% of build cost per year. Accessed 24 November 2026.
- AI Dev Planner: MVP cost calculator — UK bands for MVPs, internal tools and customer portals, timelines by product type, and the cost drivers. Accessed 24 November 2026.
Recommendations without a source are AI Dev Planner’s own engineering opinion. Platform features and prices change; check the linked pages for the current position. Found an error? See our corrections policy.
Related guides
- Building & Shipping ProductsMVP vs Prototype vs Proof of Concept: Which Do You Need First?A proof of concept tests feasibility, a prototype tests the experience, and an MVP tests demand. Build them in that order only when each question is genuinely open.
- Building & Shipping ProductsSoftware Development Cost Estimate: How to Build One Before You SignTurn a brief into a defensible cost range, normalise quotes line by line, and spot the causes of overruns before they are in the contract.
- Building & Shipping ProductsBest Software Agency to Turn Your Idea Into a Live ProductHow to judge an agency on process, not pitch: validation first, one narrow MVP, demos at the end of each two-week sprint, and code and IP in your accounts from day one.
- Building & Shipping ProductsHow to Validate a Startup Idea Before BuildingTalk to users, test the riskiest assumption first, and get a written verdict before you commit a build budget.
Browse all 127 questions in the SaaS & web development guide.
Get a number for your MVP
Run the calculator for an indicative range, or tell us the workflow your MVP must prove and get a fixed-milestone quote.